Please follow the step by step instructions from this video:
You may follow the Assembly - Cable Routing Explained article to learn more on how to go about on the cable routing
Important: It is necessary to finish the Account Activation and IR Connectivity Test BEFORE assembling the top frame of the scanner.*
*This is an image of the scanner without the top frame:
The Account Activation and IR Connectivity Test should be completed on this step before installing the top frame and calibration. Do not calibrate the scanner without the top frame.
Comments
0 comments
Please sign in to leave a comment.